One Community Health

Architect
Scott Edwards Architecture
Location
Hood River, OR, USA | View Map
Project Year
2020
Category
Hospitals
Product Spec Sheet

ElementBrandProduct Name
TileMosa
Accent PendantMuuto
Circular PendantG Lighting
ORBIS
CarpetInterface
Resilient TilesPatcraft
WindowsKawneer

Product Spec Sheet
Tile
Accent Pendant
Circular Pendant
ORBIS by G Lighting
Carpet
Resilient Tiles
Windows
by Kawneer

One Community Health

Scott Edwards Architecture as Architects

One Community Health (OCH) is an integrated health facility focused on whole-person, team-based care. Their mission is to advance health and social justice for all members of their community. OCH provides medical, dental, and behavioral healthcare, as well as public outreach and education.

photo_credit Quanta Collectiv
Quanta Collectiv

SEA worked with OCH to design a staff- and patient-centered clinic by maximizing natural light, fresh welcoming materials, branded wayfinding, re-imagined lobbies and medical spaces, and biophilic artwork from local artists. The gracious cedar wrapped canopies and handsome brick clad exteriors blend with the Hood River landscape. Bright and health-focused interiors provide the residents of the Columbia River Gorge with room to comfortably maintain distance andeasilyaccess providers and care teams.The design also optimizes mechanical systems for COVID-19 defense.

photo_credit Quanta Collectiv
Quanta Collectiv

OCH had been operating out of a 14,300 sf clinic in Hood River for over 30 years. With staff literally working in closets, the providers not only needed a much larger facility but also a space that would match the level of service their team provides for the community.

photo_credit Josh Partee
Josh Partee

SEA and OCH were eager to create a new health facility that served the growing demand for health and dental care in Hood River, andmeet their anticipated growth in the next thirty years. The team worked to support effective and efficient team-based and integrated care by accommodating greater collaboration throughout the facility. The facility provides over 32 exam and care rooms, along with team-based group rooms, laboratories, and procedure rooms. The large, bright dental facility has space for 17 dental operatories. In addition, the program provides a second-floor administrative suite, a large community room with teaching kitchen, two lobbies designed for stress-reduction, and generously sized facilities management spaces. 

photo_credit Josh Partee
Josh Partee

Construction began in May 2019 and concluded in October 2020. In the middle of construction, the project was challenged with continuing construction during a pandemic on an essential facility. While the building had already been designed to have health-focused interiors that allowed patients and staff to comfortably maintain distance, OCH and the construction team were quickly challenged with responding to the everchanging demands of operating in a health crisis. OCH also realized that to be fully operational at the end of construction, the building and the new systems would need to be adapted to increase patient and staff health based on the new parameters of the novel coronavirus. Roof-top unit UV filtration, MERV-15 filtering, reception desk screens, temporary signage, testing areas, and other programmatic social distancing strategies were researched and implemented into the building program and construction in time for staff and patients to safely occupy the essential facility.

photo_credit Josh Partee
Josh Partee

For general contractor Bremik Construction, the largest onsite challenge was keeping OCH’s existing clinic in full operation while the new clinic was being constructed across the lot. Once staff moved into the new facility, the old clinic was demolished, and the footprint became new parking with a large stormwater planter and underground stormwater retention system.

photo_credit Josh Partee
Josh Partee

In the end,the team’s approach to design and construction delivered OCH with a building and site that were on budget, on schedule, and had a highly executed level of finish and design.

photo_credit Josh Partee
Josh Partee
photo_credit Josh Partee
Josh Partee
photo_credit Josh Partee
Josh Partee

Material Used :
1. Facade cladding: Brick, Norman Dark Iron Spot Smooth, Pacific Clay

2. Flooring:   
Tile, Terra Tones in Grey Green, Mosa.
LVT, Resilient Tiles in Sand Oak, Patcraft
Sheet Vinyl, Resilient Sheet in Ivy Walk Arctic Gray
Carpet, Carpet Tiles West Elm/Heritage Craft, Interface

3. Doors:    
Solid Wood Veneer Door, 5 ply SCL in White Oak
Prefinished Steel Door Frame, TA-28 Casing in Stone Gray, Timely Frames

4. Windows: Aluminum Storefront, Trifab VG 451T, Kawneer
5. Roofing: Single Ply Roofing, TPO 60 mil Fully Adhered, Johns Manville

6. Interior lighting:   
Recessed Linear Light, Slot 4 LED, Mark
Circular Pendant, Orbis Cable Suspended, G Lighting
Accent Pendant, Unfold Pendant in Orange, Muuto

7. Interior furniture: Healthcare Grade Furniture, Herman Miller and Others, Sourced from PacificWRO

Featured Projects
Latest Products
News
Kindergarten for Llubi expresses in built form two converging patterns from its landscape context
24 May 2022 News
Kindergarten for Llubi expresses in built form two converging patterns from its landscape context

In the small Mallorca town of Llubi, this new kindergarten by Aixopluc Architects is located on a pe... More

25 best architecture firms in Mexico City
23 May 2022 News
25 best architecture firms in Mexico City

Mexico City is home to a number of outstanding, epoch-defining architectural firms. Its contemporary... More

New Singer Museum wing by Bedaux de Brouwer Architecten offers a balanced experience of art, architecture and garden
22 May 2022 News
New Singer Museum wing by Bedaux de Brouwer Architecten offers a balanced experience of art, architecture and garden

In Tilburg, NL, the new Nardinc wing of the Singer Museum by Bedaux de Brouwer Architecten houses th... More

Al Naseej Factory: A woven architecture that celebrates local craftspeople
22 May 2022 News
Al Naseej Factory: A woven architecture that celebrates local craftspeople

Located in Bani Jamrah, Bahrain, the Al Naseej Factory by Leopold Banchini is a textile weaving faci... More

Merk X revitalizes Amsterdam Zoo natural history building that was closed for 75 years
20 May 2022 News
Merk X revitalizes Amsterdam Zoo natural history building that was closed for 75 years

The neoclassical building was built between 1850 and 1855 to a design by Johannes van Maurik as a na... More

82,000 unique, hand-crafted tiles clad the new extension to Museum Arnhem by Benthem Crouwel Architects
20 May 2022 News
82,000 unique, hand-crafted tiles clad the new extension to Museum Arnhem by Benthem Crouwel Architects

In addition to restoring the original Museum Arnhem building, complete with characteristic historic... More

Estudio MMX interweaves open spaces throughout porous pigmented concrete villa
19 May 2022 News
Estudio MMX interweaves open spaces throughout porous pigmented concrete villa

A sequence of open spaces with a gradual degree of intimacy allow residents to move gently from the... More

Baumschlager Eberle Architekten’s Montagne du Parc demonstrates how concepts of sustainability can be implemented at an early stage of architectural completion
19 May 2022 News
Baumschlager Eberle Architekten’s Montagne du Parc demonstrates how concepts of sustainability can be implemented at an early stage of architectural completion

The largest project completed by Baumschlager Eberle Architekten in Europe to date, the new Montagne... More