Teobaldo Power Performing Arts Centre

Teobaldo Power Performing Arts Centre

Architect
Fernando Menis Arquitectos
Location
Calle Cantos Canarios, 1, La Orotava, Spain | View Map
Project Year
2024
Category
Concert Halls

Theaters
@Fernando Menis

Rehabilitation of the Teobaldo Power Performing Arts Centre

Fernando Menis Arquitectos as Architects

Background

Located in the historic heart of the city of La Orotava, on Tenerife island, the Teobaldo Power Performing Arts Centre, formerly "Cine Orotava", stands on the site of the old "Casa Currás" from the 18th century. Originally intended for cinema and housing, carried out on the basis of a project signed by the architect Félix Sáenz Marrero, it was completed in 1957. The building has two well-differentiated parts with different languages: while for the housing block Félix Sáenz went to repertoires released decades before by the Provincial Housing Prosecutor's Office, the design of the movie theatre shows a building with simple and rational architecture. Subsequently, after the acquisition of the building by the La Orotava City Council in 1989, the complex undergoes various interventions to improve accessibility and adaptation to its use as an Auditorium.

Artists such as Krystian Zimerman, Alfredo Kraus, Plácido Domingo, Montserrat Caballé, Ainhoa ​​Arteta, Dulce Pontes, Michel Camilo, Luis Eduardo Aute, Luz Casal, Ana Belén, Víctor Manuel, Jorge Drexler as well as important orchestras from Europe and America have performed on its stage. Known for its excellent acoustic conditions, it has been used for the recording of countless music albums.

 

Rehabilitation

The potential capacity to accommodate users from the entire north-central half of Tenerife, together with the original good quality acoustics and the wide flexibility of uses of the building after its reform, constitute a solid base to reposition this venue in a place of reference for culture in Tenerife and the Canary Islands.

Fernando Menis's redesign and expansion project proposes solutions that guarantee the conservation of the building while adding a reversible infrastructure that is respectful of the original acoustics by enhancing the functionality of the building. Thus, in addition to basic actions (reinforcing the structure, replacing the roof, updating of stage equipment and services, adapting the building to universal accessibility requirements), it proposes several strategic actions to recover the brightness and the relevance of this cultural venue.

 

Reference building: in a symbolic gesture that reaffirms the relevance of the Teobaldo Power Auditorium, the intervention recovers the original entrance through the main façade instead of the side façade. Originally the access was made through the chamfer of the main building, where today the Municipal Tourism Office is located. The change of access took place as a result of the expansion of the stage to host symphonic concerts, condemning the old stairs, now covered with a metal substructure that supports the stage gained from the hall.

 

Greater visibility: Given the great original value, the seats are restored to comply with the regulations and to guarantee the visibility of the stage, increasing its height. For this same purpose, the stage level is reduced.

 

Multipurpose stage. The addition of a lifting platform in front of the stage allows multiple possibilities: the function of the pit, the expansion of the stage, the expansion of the seating hall (stored in a warehouse adjacent to the platform) or the scenic connection between the stage and the hall through a bleacher.

 

Respect for the original acoustics. In order to preserve the great acoustics of the hall, acoustic variations of the incorporated elements have been avoided. Thus, the seats in the hall are restored without variation in acoustics, the seats in the amphitheater have an acoustic behavior very similar to the original ones, the acoustic infrastructure is acoustically invisible and the cork in the hall is replaced by one of the same characteristics with the corresponding fire treatment.

 

Multifunctional complementary structure. The most striking, although reversible, intervention is carried out with an auxiliary infrastructure, which respects the existing configuration of the hall while providing functionality and versatility. It can be used as a support for spotlights, projectors, installations but even as a balcony for the public thus allowing performances that need to extend beyond the stage and with more complex equipment.

Read story in Español

Featured Projects
Latest Products
News
25 best architecture firms in Madrid
27 Jun 2022 News
25 best architecture firms in Madrid

Madrid is a center of gravity for European architecture. Spain’s capital city is host to an am... More

Lviv’s Radio Garage offers an experimental space for temporary exhibitions with a focus on radio, sound art, VR-art, and interactive media
25 Jun 2022 News
Lviv’s Radio Garage offers an experimental space for temporary exhibitions with a focus on radio, sound art, VR-art, and interactive media

In Lviv, Radio Garage is a media art centre and an experimental gallery for temporary exhibitions wi... More

Urban infill project Manifesto Market Andel activates an underutilized gap in Prague’s urban fabric
25 Jun 2022 News
Urban infill project Manifesto Market Andel activates an underutilized gap in Prague’s urban fabric

Located in Prague’s Andel District, Manifesto Market Andel is an urban infill project activati... More

Amsterdam’s iconic Droogbak building transformed into a 21st-century office space for a prestigious law firm
24 Jun 2022 News
Amsterdam’s iconic Droogbak building transformed into a 21st-century office space for a prestigious law firm

An iconic 19th-century building next to Amsterdam Central Station, Droogbak has been transformed int... More

Renovated hacienda-style villa in Belgium respects its history while exploring form and materials
24 Jun 2022 News
Renovated hacienda-style villa in Belgium respects its history while exploring form and materials

House VD-B by Graux & Baeyens architecten is a renovated hacienda-style villa in Evergem, Belgiu... More

Landmark urban renewal project comes to the heart of Bruges with the completion of The Bruges Meeting & Convention Centre (BMCC)
22 Jun 2022 News
Landmark urban renewal project comes to the heart of Bruges with the completion of The Bruges Meeting & Convention Centre (BMCC)

In the heart of the historic city of Bruges, The Bruges Meeting & Convention Centre (BMCC) is a... More

Award-winning New Museum of Ethnography by NAPUR Architect opens in Budapest
22 Jun 2022 News
Award-winning New Museum of Ethnography by NAPUR Architect opens in Budapest

Designed by NAPUR Architect, the recently opened New Museum of Ethnography in Budapest is a purpose-... More

New Royal College of Art campus by Herzog & de Meuron unveiled in Battersea
22 Jun 2022 News
New Royal College of Art campus by Herzog & de Meuron unveiled in Battersea

The Royal College of Art unveiled its new campus in Battersea, London this past month.  With a... More